Wednesday, 27 January 2021

Power Shutdown In Kashmir Parts

SRINAGAR: According to the Power Controller, Kashmir Province, in order to carry out shifting of the Transmission line, 133KV DC Delina-Amargarh Transmission line Circuit Ist shall remain shut down on January 28 from 10 am to 4 pm.

The power supply to the area fed from the line shall remain affected.



from Kashmir Life https://ift.tt/3qTiUte
via IFTTThttps://kashmirlife.net

No comments:

Post a Comment