Wednesday, 30 September 2020

Power Shutdown In Kashmir Parts

SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to carry out stabilization, branch cutting and different maintenance works, shutdown of 33 KV lines of STD Ganderbal shall be observed as per programme given below.

The power supply to the areas falling under Receiving Stations Naidkhai, Markundal and Hajin and fed from 33 KV Nihalpora Markundal line shall remain affected on October 03, 08 and 12 from 9 am to 6 pm.

The power supply to the areas falling under Receiving Station Shadipora and fed from 33 KV Shadipora Tap line shall remain affected on October 01 and 05 from 9 am to 6 pm.

The power supply to the areas falling under Receiving Station Safapora and fed from 33 KV Badampora Safapora line shall remain affected on October 01 and 06 from 9 am to 6 pm.

The power supply to the areas falling under Receiving Station Kurhama and fed from 33 KV Badampora Kurhama line shall remain affected on October 08 from 9 am to 6 pm.

Also, the power supply to the areas falling under Receiving Station Lar, Tulmulla and fed from 33 KV Badampora Lar Tulmulla line shall remain affected on October 03 and 05 from 9 am to 6 pm.

According to the Power Controller, Kashmir Province, Srinagar, in order to carry out erection of pole with subsequent stringing/ jumpering at Ellahi Bagh Chowk, the power supply to the areas fed from 33 KV Habak-Hazratbal line shall remain affected on October 02 and 05 from 10 am to 01 pm.

Similarly, to carry out augmentation work of Receiving Station Bemina II, the power supply to the areas falling under 33 KV Receiving Stations Bemina II, JVC and PC Depot, fed from Bemina-Bemina II 33 KV line, Receiving Stations K P Bagh, Jawahar Nagar, Rakh Arth and Narakara, fed from Bemina-KP Bagh 33 KV Tap line and Receiving Stations Court Complex and Danderkah, fed from Bemina Exhibition 33 KV line shall remain affected on October 01 from 9 am to 10 am and 5:30 pm to 6:30 pm.

According to the Power Controller, Kashmir Province, Srinagar, in order to carry out branch cutting and different maintenance works, shutdown of 33 KV lines of STD Pulwama shall be observed as per programme given below.

The power supply to the areas falling under Receiving Station Airfield and fed from 33 KV Awantipora Airfield line shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Stations Tral, Lalgam, Lurgam, Chewa and Batagund and fed from 33 KV Awantipora Tral line shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Station Gagran Batapora and fed from 33 KV Kanipora Batapora line shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Stations Pinjoora and Chowdharygund and fed from 33 KV Kanipora Pinjoora line shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Stations Kakapora, Newa and Irrigation Stage, fed from 33 KV Pampore Pulwama line shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Stations Lethpora, Konibal and Khrew, fed from 33 KV Pampore Lethpora and Pampore JK Cements lines shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Station Cement Plants and fed from 33 KV Pampore Khonmoh line shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Station Naroo and fed from 33 KV Awantipora Naroo line shall remain affected on October 01 from 10 am to 5 pm.

The power supply to the areas falling under Receiving Stations Keller and Shadimarg, fed from 33 KV Kanipora Keller line shall remain affected on October 01 from 10 am to 5 pm.



from Kashmir Life https://ift.tt/2HJaS50
via IFTTThttps://kashmirlife.net

No comments:

Post a Comment