Saturday, 26 September 2020

Power Shutdown In Kashmir Parts

SRINAGAR: According to the Power Controller, Kashmir Province, Srinagar, in order to execute various DDUGJY and PMDP ongoing works, the power supply to the areas fed from 33KV Awantipora-Jawbehara tap line/ Receiving Stations Flour Mills shall remain affected on September 29 from 10 am to 6 pm.

Similarly, in order to remove blockades/ reshaping of flood spill channel D/S Rambagh flyover to Bailey bridge, the power supply to the areas falling under Receiving Stations Rakh Arath, Narakara, Jawahar Nagar and K P Bagh fed from 33 KV Bemina-KP Bagh line shall remain affected on September 27 from 10 am to 4 pm.



from Kashmir Life https://ift.tt/2S2SINi
via IFTTThttps://kashmirlife.net

No comments:

Post a Comment