Saturday, 28 December 2019

Power shutdown in Kashmir parts

Srinagar

According to Power Controller Kashmir, to carry out urgent maintenance of tower location no. 72 of 220 KV ZATL, the power supply to the areas being fed from 132 KV D/C Pattan Magma TL will remain affected from December 29 and December 30 from 11 AM to 4 PM.

Similarly, to carry out the maintenance work on newly constructed 33/11 receiving station at Pinglena, Power supply will remain affected in the areas fed from Pampore-Pulwama line on December 31 from 12 noon to 2 PM.



from Kashmir Life https://ift.tt/2Q1ScyW
via IFTTThttps://kashmirlife.net

No comments:

Post a Comment