Srinagar
According to the Power Controller, Power Development Department,(PDD) Kashmir, in order to carry out branch cuttings and stabilizations of 33 KV Lines, power supply from 33 KV Lassipora-Pulwama line shall be affected on January 06,08, and 10,2018.
The power shutdown shall be affected from 9 am to 4.30 pm on these days.
The areas receiving power supply from the said receiving station shall remain affected on the said dates and time.
from Kashmir Life http://ift.tt/2lLKt8U
via IFTTThttp://kashmirlife.net
No comments:
Post a Comment