Srinagar
Office of the Power Controller Kashmir today informed that there will be shutdown of various 33kV lines, in different areas of Srinagar, Baramulla, Ganderbal, Budgam and Bandipora for carrying out stabilisation and branch cutting.
In Srinagar 33kV Cheshmashahi-TRC and Cheshmashahi-Centaur Line and Cheshmashahi-Shalimar and Cheshmashahi-Nishat Lines will be shut down on 27-04-2019 and 29-04-2019 respectively from 9.00 am to 5.00 pm.
In Baramulla 33kV Amargarh Pattan line will be shutdown on 27-28 April 2019, HMT line on 29-30 April 2019, Kangundara line on 01 May 2019, Deiina Wagoora line on 02-03 May 2019, Uri Line on 27-28 April 2019, Boniyar Line on 29 April 2019, Watergam Line on 30 April 2019, Malpora Line on 01 May 2019, Delina Line on 02 May 2019, Baramulla Ist, IInd and MES on 03 May 2019, Pattan Amargarh line on 27-28 April 2019, HMT line on April 29-30 2019, Kongamdara Line on 01 May 2019, Delina-Wagoora line on 02-03 May 2019 and Nehalpora Gulmarg line on 4 – 5 May 2019 from 9.00am to 5.00 pm.
In Ganderbal and Bandipora, 33kV Safapora line and Shadipora Tap line will be shutdown on March 29 and May 04 2019, Markundal Line on May 04 and May 07 2019, Hajin Tap line on April 29 2019, Preng Tap Line and HCC Bandipora on April 29 and 04 May 2019 from 10.00 am to 6.00 pm.
Furthermore 33kV Pampore BK Pora and Pampore-Nagam Char Sharif from April 27 – 28 2019, Arizal tap line from April 29-30 2019, Shariefabad Narbal line on April 28 2019, Narbal Snoor (including Mazhama Tap) on 30 April 2019, Budgam-Ichgam-Kremshore line, Budgam-Waterhal line and Budgam-Ichgam-Chadoora line on April 29 and May 01 2019, Budgam-Sidco line on April 30,2019, Shariefabad-Wadwan line on May 01 2019 and Ahmadpora-Magam-Khag Tap line on April 02 2019 from 08.00am to 08.00 pm.
The power supply to the fed areas will be affected during the said date and time.
from Kashmir Life http://bit.ly/2vkXTNm
via IFTTThttps://kashmirlife.net
No comments:
Post a Comment