SRINAGAR: According to the Power Controller, Kashmir Province, in order to carry out the restoration of street light at Hyderpora flyover and to dismantle the poles at the said site which is in close vicinity of the existing 33 kV line, shut down of areas fed from 33 kV Silk Factory-Rawalpora line shall be observed on August 04 from 7 am to 9 am.
The post Power Shutdown On August 4: PDD appeared first on Kashmir Life.
from Kashmir Life https://ift.tt/33bCXuh
via IFTTThttps://kashmirlife.net
No comments:
Post a Comment