Wednesday, 17 June 2020

Power shutdown in Kashmir parts

SRINAGAR: According to the Power Controller, Kashmir Province, in order to carry out urgent maintenance and stabilization work at Shalteng Road Crossing, shut down of 33 kV line of Sharifabad-HMT shall be observed.

During the shutdown, the power supply to areas fed from Receiving Stations Zainakote, Shalteng, Bakshipora will remain affected on 20 and 21 June from 9 am to 5 pm.

Similarly, to carry out maintenance works, the shutdown of 132/33 kV 200 MVA Grid Station Wanganpora will be observed on 23 June from 9 am to 5 pm.



from Kashmir Life https://ift.tt/2YJSMVo
via IFTTThttps://kashmirlife.net

No comments:

Post a Comment