Srinagar
The office of the Chief Engineer, EM&RE Wing, Kashmir on Monday issued a press release to inform that 33 KV Safapora feeder will shut down on 19-02-2019 from 10 am to 5 pm.
The official communiqué read that the purpose of the shutdown is to facilitate the laying and stringing of conductor on 132 Kv Bamdpora Bandipora LT between dead-end tower and gantry at Badampora Grid station.
from Kashmir Life http://bit.ly/2IiulcB
via IFTTThttps://kashmirlife.net
No comments:
Post a Comment